Not brochure claims — actual customer deployments with documented operating hours, availability rates, and production data from mining, infrastructure, and marine projects across six continents.
High-abrasion iron ore stripping in 48°C peak summer temperatures. Standard KE-200 fleet with Hardox 450 rock bucket package.
"Total downtime across all four machines is under 40 hours — a 97.6% availability rate our previous supplier couldn't match." — James Hartley, Fleet Equipment Manager
Custom cold-start and high-altitude fuel mapping package for 4,500m operating elevation. First start at -18°C validated on site.
"The cold-start package and high-altitude fuel mapping worked exactly as specified — first start at -18°C with no issues." — David Chen, Procurement Director
Mixed foundation and earthmoving fleet. Singapore parts hub delivered same-week supply for all maintenance events across the programme.
"Our unplanned maintenance cost was 31% lower than our previous fleet vendor — combined with same-week parts delivery from Singapore." — Mohammed Al-Rashidi, Operations Director
18m long-reach configuration for sediment dredging at 6m water depth. Marine sealing package validated for 18 months continuous operation in freshwater/silt environment.
CE-marked EU Stage V fleet for German motorway expansion. Full documentation package (CE declarations, noise reports, REACH compliance) cleared customs and regulatory approval in 9 days.
Remote site 240km from nearest major city. Komatsu Dubai hub supplied critical parts within 36 hours via air freight for three maintenance events across the 14-month construction period.
Have a project in similar conditions? Let us connect you with a reference customer or arrange a site visit.
Request a Reference Visit